Subaru Legacy/Outback

1999-2003 of release

Repair and operation of the car



Subaru of Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ Operation manual
+ Routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
+ Electric equipment of the engine
+ Manual box and differential
+ Automatic transmission
+ Coupling
- Brake system
   Specifications
   Brake mechanisms of lobbies and back wheels - the general information
   The parking brake - a design and the principle of functioning
   Pressure valve limiter - a design and the principle of functioning
   Antiretractable system - the device, the principle of functioning and a precautionary measure
   System of anti-blocking of brakes (ABS) - the general information, the principle of functioning
   System of dynamic stabilization (VDC) - the general information, the principle of functioning
   Check of a state replacement of blocks of disk brake mechanisms of forward wheels
   Removal, check of a state and installation of forward brake disks
   Removal, service and installation of disk brake mechanisms of forward wheels
   Check of a state and replacement of blocks of disk brake mechanisms of back wheels
   Removal, check of a state and installation of back brake disks
   Removal, service and installation of disk brake mechanisms of back wheels
   Removal, service and installation of the main brake cylinder (MBC)
   Removal, installation and check of serviceability of functioning of the vacuum amplifier of brakes
   Removal, installation and check of serviceability of functioning of the valve limiter of pressure
   Replacement of brake fluid
   Pumping of a hydraulic path of brake system
   Check of a state and replacement of flexible brake hoses
   Check of a state and replacement of tubes of a brake path
   Removal, service, installation and adjustment of a pedal of a foot brake
   Removal, check of a state, installation and adjustment of the sensor switch of stoplights
   Removal, installation, check of a state and adjustment of the lever of the drive of the parking brake
   Removal, check of a state and installation of elements of the hummock drive of the parking brake
   Removal, installation and adjustment of the mechanism of the parking brake
   Removal, installation, check of a state and adjustment of components of the antiretractable device
   Removal, installation and check of serviceability of functioning of assembly of the module of the ABS management/hydromodulator
   Check of sequence of operation of valves of the ABS hydromodulator
   Removal, installation and check of serviceability of functioning of forward wheel ABS sensors
   Removal, installation and check of serviceability of functioning of back wheel ABS sensors
   Removal, installation and check of a condition of rotors of wheel sensors
   Removal, installation and diagnostics of the sensor of overloads (G-sensor)
   Problem diagnostics of ABS
   Removal, installation and adjustment of the module of management of VDC
   Removal, installation and check of serviceability of functioning of the VDC hydromodulator
   Check of sequence of operation of valves of ABS and VDC hydromodulators
   Removal, installation and check of serviceability of functioning of the sensor of withdrawal / cross overloads
   Removal, installation and check of serviceability of functioning of the sensor of an angle of rotation of a steering wheel of VDC
   Removal, installation and check of serviceability of functioning of wheel sensors with rotors
   Removal, installation and check of serviceability of functioning of the switch of deactivation of VDC (VDC OFF)
   Problem diagnostics of VDC
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




d9f1bda0

Removal, service and installation of the main brake cylinder (MBC)

GTTs installation details (models without VDC)

1 — a tank Cover
2 — the Mesh filter
3 — the Tank
4 — the Holder of pistons
5 — Primary piston
6 — the Secondary piston
7 — the cylinder Case
8 — the Finger (models with ABS)

9 — Landing sealing plugs
10 — the Pin

Efforts of a tightening of threaded connections, Nanometer

Т: 14


GTTs installation details (models with VDC)

1 — a tank Cover
2 — the Mesh filter
3 — the Tank
4 — the Lock ring
5 — Primary piston
6 — the Secondary piston
7 — the cylinder Case
8 — the Finger

9 — Landing sealing plugs
10 — the Pin

Efforts of a tightening of threaded connections, Nanometer

Т: 14

REMOVAL

 PERFORMANCE ORDER

1. Completely pump out brake fluid from the GTTs tank.
2. Disconnect an electrical wiring from the sensor switch of level of brake fluid. Disconnect from GTTs hydraulic tubes, - at once to a zakuporta the open ends of lines in order to avoid hit in system of dirt.
3. Release nuts of fastening of GTTs and separate the last from assembly of the vacuum amplifier of brakes, - try not to allow hits of brake fluid on the painted body surfaces. Immediately collect traces of the spilled liquid paper towels.

DISMANTLING

 PERFORMANCE ORDER

1. Carefully wipe GTTs surface.
2. Prepare necessary tools and accurately spread out them on a pure workbench.
3. By means of a drift take a fastening pin on GTTs of the tank of brake fluid.

4. Wring out primary piston in the cylinder and by means of a suitable magnet take the fixing finger.

5. On the models which are not equipped with system of dynamic stabilization (VDC) hook a lock uvula and remove the holder of pistons.

6. On models by means of suitable nippers remove a lock ring from VDC.

7. Be careful, - primary piston can jump out of the cylinder.
8. Take both pistons from the cylinder.

The GTTs piston group needs dismantling only in case of need of replacement of a set of springs.

9. Wash out the removed components and internal walls of the cylinder pure brake fluid or methyl alcohol.

 When using methanol do not immerse in it rubber cups of pistons more than for 30 seconds in order to avoid their swelling!

10. Attentively study a condition of the GTTs components (piston assemblies, an emphasis of the giving valve, laying and so forth). Replace defective units.

 Pistons are replaced in a set (primary with secondary). Pistons are subject to replacement also in case the gap of landing any of them in the cylinder exceeds 0.11 mm. Try not to allow hit in assembly of foreign particles.

ASSEMBLY

 PERFORMANCE ORDER

1. Make sure of absoluteness of purity of all components.
2. Grease with pure brake fluid pistons and internal walls of the cylinder and establish into place the GTTs piston group.
3. Wring out primary piston and establish into place the fixing finger.
4. On models without VDC wring out a lock uvula and put into place the holder of pistons. On models with VDC establish a lock ring, having tracked reliability of landing it in a reception flute.

5. Install landing sealing plugs on the tank.

6. Put the tank on assembly of GTTs and record it a pin.

INSTALLATION

 PERFORMANCE ORDER

1. Installation is made as it should be, the return to an order of dismantle of components. The effort of a tightening of fixing nuts makes 14 Nanometers. Cap nuts of nipple sockets are tightened with effort of 15 Nanometers.
2. Fill in fresh hydraulic liquid in the tank and pump over brake system (see the Section Pumping of a Hydraulic Path of Brake System).