Subaru Legacy/Outback

1999-2003 of release

Repair and operation of the car



Subaru of Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ Operation manual
+ Routine maintenance
+ Engine
+ Cooling systems, heating
+ Power supply system and release
- Electric equipment of the engine
   Specifications
   Start of the engine from the auxiliary power supply
   Removal/installation, check and service of the battery
   Check of a state and replacement of wires of the battery
   System of ignition - the general information and precautionary measures
   Check of serviceability of functioning of system of ignition
   Removal, installation and check of a condition of the module(s) of ignition
   Check and adjustment of installation of a corner of an advancing of ignition
   Replacement of CKP, CMP and KS sensors
   Service and replacement of spark plugs
   Check of a condition of high-voltage wires (4-cylinder engines)
   System of a charge - the general information and precautionary measures
   Check of a condition of system of a charge
   The generator - the general information, check and service
   Removal, dismantling, assembly and installation of the generator
   System of start - the general information and precautionary measures
   Check of serviceability of functioning of a starter and chain of start
   Nippondenso starter - check and service
   Mitsubishi starters - check and service
+ Manual box and differential
+ Automatic transmission
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




d9f1bda0 Наружная реклама в жулебино на сайте www.reklamalubercy.ru.

Removal, dismantling, assembly and installation of the generator

REMOVAL

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

2. Mark and disconnect the electrical wiring brought to the generator.

3. Take off a V-shaped driving belt (see the Head Routine maintenance).

4. Turn out lock and axial bolts and remove the generator from the engine.

5. It will be reasonable to bring removed from the generator car in shop as an example, - replaceable assembly has to correspond in accuracy to it on a standard size (plugs have to have the same marking, coincide by the size and an arrangement, also track coincidence of the identification marking which is beaten out on the case, or put on Schild).
6. The new / restored generators can be delivered on the market without driving pulley, - in that case the last should be rearranged from old assembly.

Dismantling and assembly

 PERFORMANCE ORDER

1. The hair dryer warm up a site (A) of a back cover of generating assembly to 50 °C.

2. Turn out four through bolts. By means of couple of suitable screw-drivers with flat stings, separate a forward cover from the stator.

A — the Forward cover
B — the Stator
With — Screw-drivers

3. Clamp anchor assembly in a vice with soft sponges, and release a nut of fastening of a pulley.
4. Unsolder connection between the rectifier and a winding of the stator for removal of the last.

 Time of warming up of connection should not exceed 3 seconds, - more long thermal influence can lead to a rectifier exit out of operation.

5. Turn out screws of fastening of assembly of the regulator of tension to a back cover, then unsolder the regulator from the rectifier.
6. Having unsoldered conducting braids, remove brushes.

7. Give a nut and remove the isolating insert of the B plug, then remove the rectifier.

A — the Nut
B — the Back cover
With — the Rectifier

8. Assembly is made upside-down. Pay attention to the next moments:

a) Before assembly fill with a brush finger in holders and fix them in this situation, having pushed a wire (A) with a diameter of 2 mm and 40 long ± 5 mm in a special opening in a back cover.

 Do not forget to remove a wire after completion of assembly!


b) Heat a landing nest in a back cover of the generator to 50 ÷ 60 °C and press the back bearing in a cover.

 Before installation of the bearing carefully wipe it, having completely removed all traces of greasing;

c) Having finished assembly, manually turn a generator pulley, checking smoothness of rotation of an anchor.

1 — the Wire
2 — the Back cover

INSTALLATION

 PERFORMANCE ORDER

1. Installation is made as it should be, the return to an order of dismantle of components.
2. In summary adjust effort of a tension of a driving belt (see the Head Routine maintenance) and check charge tension (see the Section Check of a Condition of System of a Charge).